The bridge over the River Váh in Budatín was the primary structure of this project. The bridge bearing structure was constructed as a 3-span continuous girder. In terms of cross section, it is a single-celled, two-beam bridge. The verge spans are built on a scaffold, while the centre span was constructed using the free cantilever concreting method (two stages). Parts of the bridge are the water supply and sewerage pipelines suspended on a steel footbridge. Existing, refinished abutments and support structures were used for the substructure. The bridging length is 119.098 m, and the length of bridge superstructure is 123.65 m.