The production hall for the manufacture of plasma screens with its construction made from a prefabricated skeleton is located near the village of Voderady. When handing over the construction part over to Samsung Voderady 50 000 m² of communications, loading ramps, parking spaces with surfaces from bituminous coatings and 6 000 m² of areas with surfaces from paving blocks were completed. Coarse landscapings were implemented on an are of 4 hectares. Roads and surfaces are located under the building and through these 51 000 cubic meters of earth had to be dug up and transported in order to level the plain to the specified heights. The grit placed on the surface area of the future hall had a volume of 15 000 cubic meters-