It was built with its own mobile metallic framework the individual parts of which are movable on their own chassis. The entire set enabled a fast construction of the monolithic sewer pipelines for the inner diameter 3200 mm and height of 2400 or 2650 mm. The framework line was adjusted to the concreting of the sewers in working scopes in a direct length from 3 to 18 m.