Feeder length 2.0 km. The I/49 national road relocation length is 4.5 km. Parts of the project are 6 bridges of the area of 7 751 square metres. Of these, five structures are road bridges. Two of them are constructed using the composite rod girder technology, two of them are cast-in-place concrete structures, and one consists of segments with the weight of 45 t. One bridge is a composite steel structure located within the railway. There were 645 800 cubic metres of embankments. The volume placed locally was 89 600 cubic metres of cement stabilisation layer and 67 800 tonnes of bitumen-coated mixture.