The supporting structure of the main bridge object is constructed as a continuous beam with 3 spans 75 + 303 + 54 meters with the middle span being suspended on cables in three points. The cables are guided through a skew 86 meters high pylon and anchored in anchoring blocks. As an architectural and technical solution it belongs to the significant engineering works in the current bridge construction scene.