Stretch length: 19.3 km. Parts of the project are 15 bridges, of which 8 are found within the main route, 5 bridges are located over the route and 2 such structures are on a rural road. The bridges are prefabricated structures - one overbridge is made of the cast-in-place concrete. The executed earthwork reached the volume of 1.397 million cubic metres. The volume placed locally was 112 000 square metres of the cement stabilisation layer and 135 000 tonnes of the bitumen-coated mixture.