Stretch length: 6.475 km. The stretch contains five grade-separated junctions with the overall length of ramps amounting to 7.468 km. As part of the project, there were 8.016 kilometres of local roads constructed. The 45-span flyover Prievoz is the most important bridge with its length of 1.756 km. The eight bridges situated on the ramps of the junctions are 692 m long. The overall length of additional seven bridges is 834.6 m. There were 3.987 km of noise control barriers. The surface area of carriageways is 326 205 square metres for motorways and 97 355 square metres for other roads.