D61 Hlohovec - Piešťany1980-1985

D61 Hlohovec - Piešťany

Stretch length: 15.1 km. Parts of the project are 18 bridges, of which 6 are found on the motorway; there are 7 overbridges and 5 bridges are located outside the motorway. They are prefabricated bridges, only one overbridge is a cast-in-place concrete structure. The executed earthwork presented a volume of 2.355 million cubic metres. The volume placed locally was 88 000 square metres of cement stabilisation layer and 107 000 tonnes of bitumen-coated mixture.