D2 Kúty - Břeclav, National Border SR/CR1977-1981

D2 Kúty - Břeclav, National Border SR/CR

Stretch length: 12.2 km. The bridge over the River Morava (a length of 879 m) is the largest bridge within this stretch. The main bridge structure has three spans, was built using the free cantilever concreting method, and is 169 m long.