The R1 express road within the Hronský Beňadik - Nová Baňa stretch replaced the I/65 road along the 12.5 km long portion.
SO 201-10: a bridge on the I/65 road leading over the I/76 road and the Slovak Railways track
A dual-carriageway bridge split by a mirror; the cross-section is an enclosed chamber profile, while the longitudinal section is made up of an eight-bay, additionally pre-stressed, continuous girder with the bay & bracket construction system and a constant height of the supporting structure. There are combined-style foundations of the bridge substructure with its circular pillar and the architectonically shaped head: while some of the pillars have shallow foundations of a layer of gravel, others are supported by piles of large diameter (1 220 mm).